main feature

This is a high performance primer, a high performance primer that provides protection for steel in a variety of moderately corrosive environments as part of an anti-corrosion coating system.

PRODUCT DESCRIPTION

 BGEZ-60 epoxy zinc-rich primer is a two-component anti-corrosion paint with epoxy resin, zinc powder, additives, solvents, etc.

PHYSICAL PARAMETERS

Color: Grey/Iron Red

Volume solid content: 62±2%

Standard Film Thickness: Dry Film: 50 microns Wet Film: 81 microns

Theoretical coating rate: 4.9㎡/kg, 12.4㎡/L (based on 50 micron dry film)

Actual Coverage: Consider appropriate loss factor

Flash point: 26±2℃

CONSTRUCTION INSTRUCTIONS

Surface treatment:

All surfaces to be coated should be clean, dry and free of contamination. Before coating, all surfaces should be assessed and prepared in accordance with ISO 8504:2000.
Oil and grease should be removed in accordance with SSPC-SP1 solvent cleaning.
The steel surface is sandblasted to Sa2.5 (ISO 8501-1:2007). If oxidation occurs between sandblasting and construction painting, the surface should be sandblasted again to the specified standard.
Surface defects exposed by the blast cleaning process should be ground, filled or treated in a suitable manner.
Recommended surface roughness is 40-75 microns.

mix:

This product is packaged in two cans to form a unit. Each time, it must be mixed at one time according to the specified ratio and used up within the specified mixing period.

(1) Stir the base (A) with a power agitator;

(2) Mix together all of the curing agent (B) and base (A) and mix thoroughly with a power agitator.

Mixing time: 15℃ 25℃ 40℃
                                12 hours 4 hours 2 hours

Thinner: BTE Thinner

Application method: Airless spray Air spray (with pressure pot) Brush (small areas only)

Dilution ratio: 0-5% 5-10% 0-5%

Airless Spray: Nozzle Size: 0.38-0.53mm   

               Spray pressure: 15Mpa

Drying time:

(Wet film thickness 81μm, relative humidity 50%)

15℃

25℃

35℃

dry to the touch  

1 hour

30 minutes

30 minutes

Portable  

4 hours

3 hours

2 hours

fully cured  

7 days

5 days

2 days

Recoating interval: (This product is repainted by itself)

(Wet film thickness 81μm, relative humidity 50%)

15℃

25℃

35℃

shortest  

4 hours

3 hours

2 hours

The above data are for guidance only, the actual drying time / time interval before overcoating may be longer or shorter, depending on the film thickness, ventilation, humidity, underlying paint, early loading and unloading needs and mechanical strength, etc.

Tool Cleaning: Clean all tools with BTE thinner after use.

Safety: Use this product with care. Please pay attention to the safety information on the packaging label before and during use. In addition, the safety regulations stipulated by the relevant national or local government should also be observed. Avoid breathing solvent vapors and avoid paint contact with skin and eyes. If paint gets on the skin, wash it off immediately with a suitable cleanser, soap and water. In case of splashing into eyes, rinse thoroughly with clean water and seek medical attention immediately. Precautions must be taken against fire, explosion and environmental protection. This product should only be applied in well-ventilated conditions. For construction in narrow places or places with no air circulation, strong ventilation must be provided.

PRECAUTIONS

Ø Apply this product in the occasions above 10 ℃, where the construction and curing can be carried out normally. The temperature of the paint itself must be higher than 15 ℃, and the maximum relative humidity of the curing process is 80%, preferably 40-60%. The surface to be applied must be dry, clean and at a temperature above the dew point to avoid condensation. Adequate ventilation should be provided during construction and drying in confined spaces. In order to prevent moisture from condensing, the surface temperature of the substrate should be more than 3°C higher than the dew point, and construction should be avoided in rainy, snowy and foggy weather.

Ø Mix according to the proportion of the package label, and use it after stirring evenly.

Ø The mixed paint should be used up within the allowable time. If it exceeds the allowable time, it will cause gelation and cannot be used, so take an appropriate amount and mix it. As the temperature increases, the usable time will be shortened.

Ø Before applying the next coating, the surface of the previous coating should be cleaned of oil, condensation, welding splashes and dust.

Ø Drying time is affected by changes in temperature, humidity and film thickness.

Ø The recoating interval is related to the environment. If the maximum recoating interval is exceeded, the surface must be roughened to ensure the adhesion between layers.

Ø The paint should be stored in a low temperature, ventilated and dry indoor warehouse, away from heat sources and avoid direct sunlight.

Ø Construction workers should wear protective gear according to regulations, fire-fighting equipment should be provided at the construction site and storage area, and open flames and smoking are strictly prohibited to avoid fires.

Ø This product is only suitable for professional use.

PACKAGING SPECIFICATIONS

40kg/group

STORAGE PERIOD

Unopened shelf life is one year in a cool, dry place. (25℃) 

STATEMENT

The information provided in this product manual is solely based on our knowledge obtained in the laboratory and in practice, the statements in the manual are only suggestions, and since the use of the product is usually outside our control, we only give the product itself Quality assurance. We reserve the right to modify this manual without prior notice.


Copyright 2018:Beijing Jinyu Paint Co., Ltd. | Beijing ICP preparation:09096964号-1 BBMG stock code(601992A 02009H)

Technical Support:北京迅联互动科技有限公司